Under Sod 4-2-5 is blended into the top 4 to 6 inches of soil before the sod goes down. The label method is incorporation. If you cannot mix it in, use the quarter-rate topical application.

The rate is one 25-pound bag per pallet of sod (500 square feet), which is 50 pounds per 1,000 square feet, blended into the top 4 to 6 inches of soil.

Quick answer

One 25-pound bag per pallet of sod (500 square feet), which is 50 pounds per 1,000 square feet, blended into the top 4 to 6 inches of soil — one bag per pallet, no rate math. For 1,000 sq ft (two pallets) you'd use two bags, or 50 lb total, blended 4 to 6 inches deep; for 1,500 sq ft (three pallets), three bags at the same depth.

The rate, stated plainly

Lawn size

500 sq ft

Pallets of sod

1 pallet

Under Sod 4-2-5 needed

one 25 lb bag, blended 4 to 6 in deep

Lawn size

1,000 sq ft

Pallets of sod

2 pallets

Under Sod 4-2-5 needed

two bags (50 lb), blended 4 to 6 in deep

Lawn size

1,500 sq ft

Pallets of sod

3 pallets

Under Sod 4-2-5 needed

three bags (75 lb), blended 4 to 6 in deep

One 25 lb bag per 500 sq ft pallet (50 lb per 1,000 sq ft), blended into the top 4 to 6 inches of soil — roughly 5 lb per 100 sq ft.

That works out to roughly 5 lb per 100 sq ft. The bag is sized to the pallet on purpose, so there's nothing to weigh out or calculate — you buy one bag for every pallet of sod you're installing.

Common mix-up: the correct Under Sod 4-2-5 rate is 25 lb per 500 sq ft (50 lb per 1,000 sq ft), blended into the top 4 to 6 inches of soil, not 25 lb per 1,000 sq ft. A 1,000 sq ft lawn needs 50 lb (two bags).

Why the rate is matched to the pallet

Most starter and lawn fertilizers are sold in bags that cover 5,000 sq ft or more, which means a homeowner sodding a single pallet has to measure out a fraction of a bag and store the rest. Matching one bag to one 500 sq ft pallet, blended 4 to 6 inches deep, removes the guesswork and the leftover bag in the garage — and it keeps the application rate correct, which matters more with a biological product than a straight synthetic one.

How to apply it

  1. Spread the bag (50 lb per 1,000 sq ft) evenly across the prepared, graded soil for that pallet's area, ready to blend into the top 4 to 6 inches in the next step.
  2. Mix it into the top 4 inches of prepared topsoil with a tiller, harrow, or power rake, up to 6 where the topsoil lift is deeper.
  3. Lay the sod, then water in thoroughly.

The fine SGN 90 granule is meant to settle into the soil-to-root contact zone, not sit on the surface.

Where Under Sod 4-2-5 fits

Under Sod 4-2-5 is a 4-2-5 iron-free biological pre-plant fertilizer — low phosphorus, potassium-forward, with named endomycorrhizae, a *Bacillus* and *Trichoderma* biology package, seaweed, and humic acid (plus fulvic acid). The bag-per-pallet rate is part of the design: one pallet, one bag, done. See the full product specs.

Frequently Asked Questions

How much starter fertilizer do you need per pallet of sod?+

Under Sod 4-2-5 goes down at one 25-pound bag per pallet of sod (500 square feet), which is 50 pounds per 1,000 square feet, blended into the top 4 to 6 inches of soil. Count your pallets to count your bags.

How much Under Sod 4-2-5 does a 1,000 sq ft lawn need?+

50 lb — two 25 lb bags. A 1,000 sq ft lawn is two pallets, so it takes two bags. The rate is 25 lb per 500 sq ft, blended into the top 4 to 6 inches of soil, not 25 lb per 1,000 sq ft.

What is the application rate per 100 sq ft?+

Roughly 5 lb per 100 sq ft, which is exactly one 25 lb bag per 500 sq ft pallet, blended into the top 4 to 6 inches of soil.

Keep reading

Step two

Day 30: OVER SOD™ 8-0-6 is step two, a phosphorus-free surface feed with mostly slow-release nitrogen, at one 25-pound bag per four pallets of sod (2,000 square feet), which is 12.5 pounds per 1,000 square feet: about 1 pound of nitrogen, 0.75 pound of potash, and no phosphate. Water it in. If day 30 falls inside your state's fertilizer blackout, wait for the first allowed date. OVER SOD™ ships spring 2027. About Over Sod 8-0-6

Homeowners and installers are already asking what goes under new sod. Under Sod 4-2-5 is the brand built specifically for that job, blended into the soil. The label method is incorporation. If you cannot mix it in, use the quarter-rate topical application.

Built for beneath the sod.

A 4-2-5, iron-free biological pre-plant fertilizer — named mycorrhizae, beneficial bacteria, Trichoderma, seaweed, and humic acid — at one bag per pallet of sod (500 square feet), which is 50 pounds per 1,000 square feet, blended into the top 4 to 6 inches of soil.

UNDER SOD™

The first biological starter fertilizer engineered to go beneath new sod.

Distributed By

CT Sod and select regional partners.
Northeast network: CT, MA, NY, NJ, RI, NH, VT, ME, PA.

UNDER SOD™ is a trademark of Under Sod Brands LLC. Sold and distributed through CT Sod and select regional partners.

© 2026 UNDER SOD™. All rights reserved.